Project

Hunan Province Power Support And Protection Project

2025-09-05

During the Chinese New Year in 2023 (January 2023), Hunan Province was hit by a widespread snowstorm and ice storm, posing significant challenges to the power grid. To address the peak demand for electricity during winter and ensure the stability of power supply, Zhengzhou Shizhan  Industrial Co., Ltd. responded to the call of Hunan Electric Power Company of State Grid, immediately allocating resources for material production, to ensure the normal operation of power supply. Under the unified coordination and leadership of the provincial Party Committee and government as well as the State Grid Corporation, the company worked closely with various departments to ensure the smooth operation of the power grid throughout the province and the overall reliability of power supply. Eventually, it successfully won the battle for power supply guarantee during the ice disaster.

 

case01

Send MESSAGE

    contact us

    Copyright © ZHENGZHOU SHIZHAN INDUSTRIAL CO., LTD. Power by yisainuo

    Home Tel Mail Inquiry